Skip to main content

School Expansion Project – Three-Story Building is being Gutted!

By January 19, 2021Uncategorized

Have you driven by the three-story Silverada building recently and noticed the a fenced-off construction zone and a large orange chute that drops down to a waste removal truck?  That’s the sign that exciting things are happening inside the building!

The building is currently being “gutted” or stripped down to the structural components.  Walls, flooring, ceilings and fixtures are being removed in preparation of the upcoming complete remodel of all 30,000 square feet of this building. Here’s a sneak peek at what’s happening inside!

Leave a Reply