Warning: call_user_func_array() expects parameter 1 to be a valid callback, function '_wp_block_theme_register_classic_sidebars' not found or invalid function name in /home/hdwebsite/public_html/wp-includes/class-wp-hook.php on line 308
January 2021 – High Desert Montessori Reno Skip to main content
Monthly Archives

January 2021

School Expansion Project – Three-Story Building is being Gutted!

By UncategorizedNo Comments

Have you driven by the three-story Silverada building recently and noticed the a fenced-off construction zone and a large orange chute that drops down to a waste removal truck?  That’s the sign that exciting things are happening inside the building!

The building is currently being “gutted” or stripped down to the structural components.  Walls, flooring, ceilings and fixtures are being removed in preparation of the upcoming complete remodel of all 30,000 square feet of this building. Here’s a sneak peek at what’s happening inside!